Norton High School Building Project
Repairs / Renovations / Addition
66 West Main Street, Norton MA

Home
Resources & Archives
MSBA - State Grant
Bldg Committee
Estimated Tax Impact
Floor Plans
Main Office
Cafeteria
Auditorium
Media Center
Art-Music-Tech
Classrooms
Fitness Area
Science Labs


New Plot Plan


New Front Entrance


New North Perspective


New East Perspective


New South Perspective

New Cafeteria Design - From Entryway


Interior Designs (click on the image below for full size):

      
 Library entrance         Cafeteria Colors      1st Floor Pattern     2nd Floor Pattern

          Cafeteria entrance     Cafeteria Top View              Cafeteria Side View     

       
   Auditorium down          Auditorium up            Front Entrance

        
    Site Plan               Main Entry Interior       Main Stair / Art Wall          

    
       1st Floor                 2nd Floor             Project Schedule   Project Scope Matrix    

           Front Entrance       North perspective      East perspective       South perspective

Pre-Construction Milestone Dates


 Number of Visitors: Hit Counter    
 

 

Interior Design
 
 

Interior Design Presentation
Design Development Presentation
Floor Plans - click to downl
oad
with furniture, detailed layouts,
and room descriptions

Pre-Construction Planning
Procurement Recommendations
Milestone Dates
Construction Phasing Diagram

 

Project Overview

The town of Norton has completed the Design Development (DD) phase of the Norton High School repair, renovation, and addition project.  We are currently in the Pre-Construction phase. Click to review pre-construction milestone dates.

Please click to download the recent presentation made to the building committee by our Architects and Engineers, as part of the interior design planning. 

We have selected W.T. Rich as our Construction Management company.  W.T. Rich, JCJ Architecture, Pinck & Company, and the Building Committee worked collaboratively to complete the DD, which has been submitted to the MSBA.  This DD phase also included a detailed Value Engineering review by the Building Committee to help ensure the project stays under budget throughout construction.  As we move further through the process, we will keep updates posted to this website. 

We are excited that the town has approved this project, through town meeting appropriation (90% approval) and debt exclusion election (70% approval).  Our reimbursement rate has been determined to be 64.42%. which will bring $21.1M in state grant dollars to our High School project.   The MSBA Board of Directors voted to approve the Norton High School renovation/addition project.  Download the Total Project Budget sheet.

The project includes a two-floor addition on the east end of the school (near football field), along with a complete repair/renovation of the existing building.   It will bring the building up to code, meet state space and educational requirements, replace systems, heat, roof, windows and ceiling/flooring as well as making many other enhancements to the school.  

The project scope includes the full repair/renovation of:
windows, heating/ventilation, plumbing, electrical, mechanical, roof, accessibility, ceiling/flooring tiles, asbestos, fire/safety, classrooms, science labs, technology, gym space and locker rooms, storage, cafeteria/kitchen, auditorium, general space needs, music/band, and restrooms.   An addition will be included.   
The total cost is $34M (includes cost of sewer connection), of which the town would be responsible for $12.9M after the MSBA reimbursement of 64.42%.                                                                                                                                              

Home | Resources & Archives | MSBA - State Grant | Bldg Committee | Estimated Tax Impact | Floor Plans | Main Office | Cafeteria | Auditorium | Media Center | Art-Music-Tech | Classrooms | Fitness Area | Science Labs

 This website is managed by and is under proprietary control of the Norton High School Building Committee
For problems or questions regarding this web contact please email: kevinoneil@nhsbuildingproject.org