Norton High School Building Project
Repairs / Renovations / Addition
66 West Main Street, Norton MA

Home
Resources & Archives
MSBA - State Grant
Bldg Committee
Estimated Tax Impact
Floor Plans
Main Office
Cafeteria
Media Center
Art-Music-Tech
Classrooms
Fitness Area
Science Labs


New Plot Plan


New Front Entrance


New North Perspective


New East Perspective


New South Perspective

New Cafeteria Design - From Entryway


Project Plans (click images below for full size):

          Cafeteria entrance     Cafeteria Top View              Cafeteria Side View     

       
   Auditorium down          Auditorium up            Front Entrance

        
    Site Plan               Main Entry Interior       Main Stair / Art Wall          

    
        1st Floor                  2nd Floor             Project Schedule   Project Scope Matrix    

           Front Entrance       North perspective        East perspective       South perspective

 

New Information from Design Development

Design Development Presentation

Floor Plans - click to download
with furniture, detailed layouts, and room descriptions

Construction Phasing Diagram

Project Overview

The town of Norton has completed the Design Development (DD) phase of the Norton High School repair, renovation, and addition project.  Please click to download the recent presentation made to the building committee by our Architects and Engineers, as part of the DD phase.  We have selected W.T. Rich as our Construction Management company.  W.T. Rich, JCJ Architecture, Pinck & Company, and the Building Committee worked collaboratively to complete the DD, which has been submitted to the MSBA.  This DD phase also included a detailed Value Engineering review by the Building Committee to help ensure the project stays under budget throughout construction.  As we move further through the process, we will keep updates posted to this website. 

We are excited that the town has approved this project, through town meeting appropriation (90% approval) and debt exclusion election (70% approval).  Our reimbursement rate has been determined to be 64.42%. which will bring $21.1M in state grant dollars to our High School project.   The MSBA Board of Directors voted to approve the Norton High School renovation/addition project.  Download the Total Project Budget sheet.

The project includes a two-floor addition on the east end of the school (near football field), along with a complete repair/renovation of the existing building.   It will bring the building up to code, meet state space and educational requirements, replace systems, heat, roof, windows and ceiling/flooring as well as making many other enhancements to the school.  

The project scope includes the full repair/renovation of:
windows, heating/ventilation, plumbing, electrical, mechanical, roof, accessibility, ceiling/flooring tiles, asbestos, fire/safety, classrooms, science labs, technology, gym space and locker rooms, storage, cafeteria/kitchen, auditorium, general space needs, music/band, and restrooms.   An addition will be included.   
The total cost is $34M (includes cost of sewer connection), of which the town would be responsible for $12.9M after the MSBA reimbursement of 64.42%.   

                                                                                                                                            

Download Complete Project Schedule

 Number of Visitors: Hit Counter    
 

Home | Resources & Archives | MSBA - State Grant | Bldg Committee | Estimated Tax Impact | Floor Plans | Main Office | Cafeteria | Media Center | Art-Music-Tech | Classrooms | Fitness Area | Science Labs

 This website is managed by and is under proprietary control of the Norton High School Building Committee
For problems or questions regarding this web contact please email: kevinoneil@nhsbuildingproject.org